标准摘要
[中文适用范围]: 该技术报告包括行业从业者在延迟焦化装置焦炭塔和外围部件的设计@制造@操作@检查@评估和维修方面所使用的实践信息和指南。该指南是一般性的,并不反映与延迟焦化技术@或检查工具@操作设备/组件@维修技术@和/或承包商提供的工程评估许可人提供的设计相关的具体细节。对于与许可方提供的设计或承包商提供的服务相关的详细信息,应咨询许可方或承包商,以获得其设计细节和操作指南的指导和建议。本文件是一份技术报告,因此@提供了行业中常用的做法,而不是延迟焦化装置中焦炭塔的 API 推荐做法。 [外文原描述]: This technical report (TR) includes information on the practices used by industry practitioners in the design and fabrication of coke drums and peripheral components in delayed coking units. The information is general and does not reflect specific details associated with a particular design offered by licensors of delayed coking technology. Note that degradation mechanisms, inspection, repair, and operating practice effects on drum reliability that were in the First Edition of this TR are now in API Technical Report 934-J. Going forward, API 934-G will pertain to new drum design and fabrication, while API 934-J will pertain to in-service issues for existing drums. See Table 1 for a summary of the information categories.
英文名称Design and Fabrication of Coke Drums and Peripheral Components in Delayed Coking Units