标准摘要
[中文适用范围]: 本部分IEC 61784-5规定了CPF 16(SERCOS 1)的安装配置文件。安装配置文件在附录中规定。这些附录应与IEC 61918:2013结合阅读。 本附录(规范性)规定了通信配置文件CP 16/1(SERCOS I)和CP 16/2(SERCOS II)的安装配置文件。CP 16/1和CP 16/2在IEC 61784-1中规定。 本附录(规范性)规定了通信配置文件CP 16/3(SERCOS III)的安装配置文件。CP 16/3在IEC 61784-2中规定。 [外文原描述]: IEC 61784-5-16:2013 specifies installation profiles for CPF 16 (SERCOS). Each CP installation profile is specified in a separate part of this series of standards. The IEC 61784 series is produced to facilitate the use of communication networks in industrial control systems. This publication is to be read in conjunction with IEC 61918:2013 .
英文名称Industrial communication networks - Profiles - Part 5-16: Installation of fieldbuses - Installation profiles for CPF 16