标准摘要
[中文适用范围]: 本国际标准定义了工厂验收测试(FAT)、工厂集成测试(FIT)、现场验收测试(SAT)和现场集成测试(SIT)的要求和检查清单。这些测试旨在证明自动化系统符合适用规范的要求。 本文件为包括业主、买方和供应商在内的所有相关方提供了一种明确建立和商定活动范围和责任的手段,以实现自动化系统的及时交付和验收。 本文件规定的活动可用于制定适应特定工艺/工厂/设备要求的测试计划。 本文件的附件包含检查清单,可供在准备特定自动化系统的测试程序和文档时参考。 [外文原描述]: IEC 62381:2024 defines requirements and checklists for the factory acceptance test (FAT), the factory integration test (FIT), the site acceptance test (SAT), and the site integration test (SIT). These tests are carried out to demonstrate that the automation system meets the requirements of the applicable specification. This document provides a means for all parties, including the owner, the buyer, and the vendor, to clearly establish and agree on the scope of activities and responsibilities involved in performing these tests in order to achieve a timely delivery and acceptance of the automation system. The activities specified in this document can be used to develop test plans adapted to the specific requirements of the process/plant/equipment. The annexes of this document contain checklists which are available for consideration when preparing specific test procedures and documentation for a specific automation system. This edition includes the following significant technical changes with respect to the previous edition: a) General re-organization of the standard; b) Current technology incorporated; c) Optional factory integration test (FIT) added; d) Replaced the forms in the annexes with detailed checklists of activities which can be used to develop project-specific test plans; and e) Provided additional references to other applicable standards.
英文名称Automation systems in the process industry - Factory acceptance test (FAT), site acceptance test (SAT), and site integration test (SIT)