标准摘要
[中文适用范围]: 本文件是一项技术规范,适用于由两个换流站和连接的高压直流输电线路组成的电压源换流器(VSC)高压直流(HVDC)系统的调试。测试通常适用于所有HVDC配置,可能需要增加或删除以适应给定的解决方案。本文件提供了调试活动规划的指导。通过现场测试对整个系统功能进行调试,包括对子系统和系统的测试。本文件提供了测试的范围、程序和验收标准。工厂系统测试、现场设备测试、电极测试和试运行不包括在本文件中。 [外文原描述]: IEC TS 63336:2024, which is a technical specification, applies to the commissioning of voltage-sourced converter (VSC) high voltage direct current (HVDC) systems which consist of two converter stations and the connecting HVDC transmission line. The tests are generally applied to all HVDC configurations and could require addition or deletion to match the given solution. This document provides guidance on the planning of commissioning activities. The commissioning described in this document is implemented through on-site testing on the whole system functionality, including testing on the subsystem and system. This document provides the scope, procedures and acceptance criteria of the tests. Factory system tests, on-site equipment tests, electrode tests, and trial operation are not included in this document.
英文名称Commissioning of VSC HVDC systems