[中文适用范围]: 处理放样工作的不同阶段,即现场主要框架(导线、网格等)的测量、参考线(基线)的放样、参考线的转移(管道安装)到现场其他楼层、位置点的设置以及这些不同阶段的调平程序。 给出了测量和放样时允许的偏差值,并建议使用某些程序和仪器。 [外文原描述]: Deals with the different stages of the setting out work, i.e. the measuring of the primary framework (traverses, grids, etc.) on the site, the setting out of reference lines (baselines), the transfer (plumbing up) of reference lines to other floors, the setting out of position points and the levelling procedure for these different stages. Gives values for permissible deviations when measuring and setting out and recommends certain procedures and instruments to be used.
英文名称Measurement methods for building — Setting-out and measurement — Part 1: Planning and organization, measuring procedures, acceptance criteria